cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Migrating from Mega 2009 to Hopex V4

Solved
vitalis
MEGA Partner

Migrating from Mega 2009 to Hopex V4

Despite the fact that we have followed all the steps mentioned in how to migrate document, we had a problem with diagram representation (as shown in the picture below) when migrating from Mega 2009 to Hopex V4. Do you have any suggestions how to solve this problem?
Ps: the problem with diagram appeared during the last transition from Hopex V2R1CP7 to V4 CP2

3 Replies
LMeden
MEGA Partner

Check your options. In V4 BPMN diagrams are automatically filled in.

If a process is described in multiple diagrams it will look like your picture. Remove the checkmark and it should all be ok.

 

Auto filling.png

vitalis
MEGA Partner

Problem resolved, thank you for your help 😁

 

hcontreras
Super Contributor

The same solution applied from Hopex V2 to V4