cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

What are the steps to properly link Cost Line to Technical Functionality

Highlighted
New Contributor

What are the steps to properly link Cost Line to Technical Functionality

I had posted this in the use cases and best practices, but thought that maybe it is more a question aligned to Functional Product and Methodology.  Didn't see a way to link that to the Forum, so apologize for the double post...

 

We need to be able to capture cost at the Technical Functionality level as this aligns to our budget lines.  The software Technology is the realization of the Technical Functionality as described in either a map or catalog.  

 

I know that we can create a MetaAssociation to link the Cost Line MetaClass to the Technical Functionality MetaClass, but I am unsure of how to add the menu item so that the cost line is able to be added for each Technical Functionality within a catalog or map.

 

Is there a reference for the proper way to Link these MetaClasses and have the linked MetaClass selectable from the menu?

 

Thanks

~Bruce

0 Replies